East Cobb
By Deborah Morton, Managing Partner, The Agency Atlanta. RealTrends Top 1.5%.
On Tuesday evening, October 27, 2026, the Cobb County Board of Commissioners met in the second-floor meeting room of the David Hankerson Building at 100 Cherokee Street in Marietta and adopted amendments to the Official Code of Cobb County, including new rules for backyard accessory dwelling units in unincorporated Cobb. Yes, you can now pursue one ADU on a single-family lot, but only if the unit meets the county's limits on size, height, location and use, and only through the process Chapter 134 actually sets out, which includes a special land use permit in the districts the use table lists.
An ADU is a smaller second home on the same lot as the main house. It can be attached or detached. It is not a weekend project, and it is not an automatic yes. This post walks through the adopted Chapter 134 text the county posted after that vote, and it flags what you should still confirm with Cobb County Community Development before you draw a plan.
Cobb adopted its 2026 code amendments on October 27, 2026. The zoning chapter, Chapter 134, now defines an accessory dwelling unit as "a residential dwelling unit subordinate to the principal single-family dwelling unit on the same lot." That unit may be attached to the main house or detached from it.
The county's news page posted the final approved chapters, including Chapter 134, after the vote. The cover of that zoning chapter and the county's final summary of revisions are both marked as adopted October 27, 2026. The rules apply to unincorporated Cobb County. They do not replace the zoning code of any city. If your lot sits inside Marietta, Smyrna, Kennesaw, Acworth, Powder Springs or Austell, you follow that city's rules, not this county ordinance.
Some Cobb cities already had their own ADU rules, and Marietta is one example. Start with a simple question: is this lot in unincorporated Cobb, or is it inside a city? An East Cobb mailing address does not answer that by itself. Check the parcel.
Only if the lot is in unincorporated Cobb, and only if the zoning district is one where Chapter 134 allows an ADU. The adopted summary of uses in Section 134-192 lists an ADU as a special land use permit use in seven single-family districts: R-80, RR, R-40, R-30, R-20, R-15 and R-12. The RD, RA-4 and RA-5 columns in that same table are left blank.
Treat that list as a starting point, not a substitute for a parcel check. Look up the property on the county's zoning maps, then confirm the district and any conditions with the Zoning Division. If you are in the East Cobb area and are not sure whether the lot is unincorporated, start with our East Cobb area guide and still verify the jurisdiction on the county map.
The code also says the ADU cannot conflict with covenants, deed restrictions or HOA bylaws. An applicant has to sign an affidavit stating that it does not. In much of unincorporated Cobb, that review matters as much as the zoning district. A lot can sit in an eligible district and still be blocked by a recorded covenant.
One. The adopted standards say there shall be no more than one ADU per single-family lot. The definition of a single-family dwelling unit in Section 134-1 says the same thing another way: the primary structure may include up to one accessory dwelling unit.
The size cap is also firm. The ADU shall not exceed 50% of the gross square footage of the primary structure, or 850 square feet. The smaller of those two figures controls. On a 1,400-square-foot main house, half the gross square footage is 700, so the ADU could not exceed 700 square feet. On a 2,400-square-foot main house, half is 1,200, so the 850-square-foot cap is the one that binds. Ask zoning staff how the county counts the main house's gross square footage before you treat a floor-plan total as final. The 850-square-foot figure is the headline maximum; the half-size rule is the one that shrinks the project on a smaller house.
Rear yard only. The unit must also meet the side and rear setbacks that apply to the main house. It has to follow the other accessory-structure standards in the zoning district, and the lot still has to stay within the district's maximum impervious surface coverage. A backyard that already has a pool, a patio and a wide driveway may run out of coverage before it runs out of room on a site plan.
Height has two limits. The ADU may occupy no more than one floor of the accessory structure, and it may not be taller than the main house. A two-story carriage house over a garage is not what this language describes. If someone shows you a two-level plan and calls it an ADU, take that plan back to the Zoning Division first.
In the districts listed in the use table, an ADU is a special land use permit use. Section 134-37 also says that an ADU accessed from a separate entry from the primary structure shall require a special land use permit. That permit is not an over-the-counter building permit. It goes to the Board of Commissioners at a zoning hearing, where the county can consider the specific lot and neighbors can speak. Budget time for an application and a hearing, not just for construction drawings.
The "separate entry" sentence is worth a direct question to zoning staff if you are considering an attached design that shares the main house's entrance. Do not assume that layout is exempt, and do not assume it is automatically approved. Check the current Chapter 134 text rather than relying on a summary, including this one.
A building permit, utility work and inspections still sit downstream of zoning approval. Adding a backyard ADU is a different path than finishing space inside the main house, but both run through county review. If you are weighing interior space instead, our guide to finishing a basement in Cobb County covers permits, egress and what that kind of project can mean at resale.
The owner has to live on the property. The adopted text says the owner or owners shall reside in either the primary single-family dwelling or the ADU. This is not a rule that lets an investor buy a house, live elsewhere, and rent both buildings.
Short-term rental of the main house or the ADU is not allowed. A longer-term rental of one of the two dwellings can fit the ordinance only if the owner still lives in the other one, and only if that use also complies with any covenants and with the occupancy rules in Section 134-1. Confirm those details with the county before you advertise a unit.
Two construction details are easy to miss if you only remember the size cap. At least one off-street parking space must be provided for the ADU, and the ADU must be connected to the utility meters of the main house. Occupancy and parking for the main house and the ADU together also have to follow Section 134-1, which includes living-area and overnight-parking limits. Read that section with zoning staff if more than a couple of vehicles will be on the lot overnight.
Topic | Adopted standard in Chapter 134 |
|---|---|
How many | No more than one ADU per single-family lot |
Size | No more than 50% of the main house's gross square footage, or 850 square feet |
Height | No more than one floor, and no taller than the main house |
Location | Rear yard only, meeting the main house's side and rear setbacks |
Parking | At least one off-street parking space for the ADU |
Utilities | Connected to the main house's utility meters |
Permit | Special land use permit in the districts listed in Section 134-192; a separate entry also requires that permit under Section 134-37 |
Owner occupancy | The owner must live in the main house or the ADU |
Short-term rentals | Not allowed in the main house or the ADU |
Covenants | The ADU cannot conflict with covenants, deed restrictions or bylaws; the applicant signs an affidavit |
As of the sources checked for this post on November 19, 2026, the adopted Chapter 134 text is the authoritative description of the standards. Confirm current application forms, hearing schedules and any effective-date details with Community Development, because those process items can change after an ordinance is adopted.
Work in this order, and stay in writing when you can. Confirm the lot is in unincorporated Cobb, not inside a city. Look up the zoning district and any case conditions on the county zoning map, then confirm what you saw with the Zoning Division. Read the current Chapter 134 text, especially Sections 134-1, 134-37 and 134-192. Pull any recorded covenants, deed restrictions and HOA bylaws and have them reviewed before you file; the affidavit is a sworn statement, not a formality. Then measure the main house, the rear yard, setbacks, parking and impervious coverage against the standards above. If the concept still fits, ask the county what a special land use permit application requires for your lot. If any of those checks fails, stop and revise the plan.
The October 27 amendments tell you what unincorporated Cobb will consider going forward. They do not automatically legalize a guest house, apartment or garage unit that was built earlier without the right approvals. If you already have a second living space, ask the county what is on file for the property, and be accurate about permitting if you list the home or take it under contract.
A permitted, well-documented ADU can matter at resale, but it does not come with a fixed price bump. Value still comes from comparable sales, condition and how buyers see the space. If you want a current read on an East Cobb home, start with What Is My House Worth in East Cobb? If you already have a guest house and are thinking about listing, our East Cobb guide to selling a home with an ADU or guest house walks through pricing, marketing and disclosure issues that a standard listing does not cover.
Buyers should do the same work in reverse. Do not treat a finished room over a garage, or a basement kitchen, as an ADU unless the county records and the current code support that description.
Yes. Cobb County adopted zoning amendments on October 27, 2026, that allow one accessory dwelling unit on a single-family lot in unincorporated Cobb, subject to the standards and permit process in Chapter 134. City lots follow the city's own code.
It cannot exceed 50% of the main house's gross square footage, or 850 square feet, whichever is smaller. It may occupy no more than one floor and may not be taller than the main house.
In the rear yard only, meeting the main house's side and rear setbacks, plus the district's other accessory-structure rules and impervious surface limit.
In the districts listed in Section 134-192, an ADU is a special land use permit use. Section 134-37 also requires that permit for an ADU accessed from a separate entry. The application goes to the Board of Commissioners at a zoning hearing. Confirm the path for your design with the Zoning Division.
No. Short-term rental of the main house or the ADU is not permitted. The owner must live in one of the two dwellings.
The adopted use table lists a special land use permit for ADUs in R-80, RR, R-40, R-30, R-20, R-15 and R-12. Check Chapter 134 and your parcel's current zoning rather than stopping at the table.
Questions about a specific address? Call (470) 990-4414.
Start Your New Home Search Now!
Stay up to date on the latest real estate trends.
You’ve got questions, and we can’t wait to answer them.